Time to enhance our substation maintenance programme, by identifying and using CM technologies that allow us to continuously or periodically monitor and diagnose in order to forecast component degradation so that as needed, planned maintenance can be performed prior to equipment failure”
Referentie | OEM-verpakkingsindustrie | Optimalisatie reserveonderdelen met een SAP- en On Key-gebruikersinterface
Complexe interfaces tussen softwaresystemen zijn verwijderd, waardoor het beheer van grote aantallen (reserve) onderdelen voor…
Find out more
Client Reference | Facilities Retail | Maintenance Budget Management
Our client managed their operational budgets reactively using spreadsheets. It created a lot of manual…
Find out more
Diamonds | Cascade conveyors
Cost savings from elimination of root causes of incorrect cascade positioning failure are calculated to…
Find out more
Mining | Planning and Scheduling
Introducing the On Key planning and scheduling tool highlighted the amount of unnecessary Work Orders,…
Find out more
Reference story | Automotive | Downtime reduction
The Focused Improvement project at the Marriage Station resulted in a deeper analysis of the…
Find out more
Mining | Mobile work management
Since the roll-out of the application, it has made it much easier to measure work…
Find out more
Case Study | Manufacturing FoodBev | C&D Foods | OK Implementation
Pragma allows analysis of maintenance spends per asset, real-time inventory management and fast reporting capability.…
Find out more
Case Study | Mining | Coal | LG Cyclone Feed Pipe
Coal mining operations mine and deliver coal from open cast pit to a crushing circuit.…
Find out more