Time to enhance our substation maintenance programme, by identifying and using CM technologies that allow us to continuously or periodically monitor and diagnose in order to forecast component degradation so that as needed, planned maintenance can be performed prior to equipment failure”
Client Reference | Power Utility | Improved MV Substation Reliability and Safety with CM
More content
Client Reference | Manufacturing | Automotive | On Key Work Planning & Control on SAP® PM
On Key allows us to plan, schedule and allocate tasks to our artisans based on…
Case Study | Oil and Gas | Fuels Retail | Permit To Work Blended Training
The fuels retail sector has a standard health and safety work process for all employees…
Automotive | Improved uptime
With the aid of On Key and the Focused Improvement business process, it assisted us…
Reference story | Municipal | AM Maturity Assessment
Shift towards optimal mix of reactive to proactive planned maintenance.
Client Reference | CRS Local Government Hydro Power Station – Spare Parts Optimisation
Discover how structured, value-based spare parts optimization achieved 34%+ IRR. It improved asset uptime, reduced…
Case Study | Distribution Facilities | Retail | Pepkor
50% decrease in turn around time to complete work orders Accurate and up to date…
Client Reference | OEM | Packaging | 3PE | Rapid Response | On Key
It was a big help to get all the maintenance recommendations from the different equipment…
Case Study | Mining | Coal | Primary Crusher Tip Bin Blockage
The primary crusher blocked on oversize material and suffered a breakdown that delayed production for…
Case Study | Mining | Coal | CNV 202 Take up Track Wheel Failure
Coal mining operations mine and deliver coal from open cast pit to a crushing circuit.…
Client Reference | Mining Coal | FI on LDV Maintenance Costs
This focused intervention will help me to have more control over my costs and to…
