Offline and online condition assessments were conducted during the repair process to validate that the workmanship was successfully implemented to the correct standards.
Client Reference | Water Utility | Fixes on Critical Switchgear Components
More content
Diamonds | Cascade conveyors
Cost savings from elimination of root causes of incorrect cascade positioning failure are calculated to…
Case Study | Retail | Pick n Pay | Making informed decisions, increasing efficiency and saving costs
Pick n Pay is a fast moving consumer goods retailer based in Africa. They operate…
Case Study | Direct impact of the leak detection survey and repairs estimated at a R 661,672.00 saving per annum
The Parmalat plant in Kyalami produces and packages a number of different yoghurt products. The…
Case Study | Retail | Massmart | Making informed decisions, increasing efficiency and saving costs
Massmart is a South African based globally competitive regional management group, invested in a portfolio…
Client Reference | Local Government | Fleet Management | Insurance Management Tool
Our client required an insurance management tool to manage and report on insurance claims and…
Reference story | Automotive | Downtime reduction
The Focused Improvement project at the Marriage Station resulted in a deeper analysis of the…
Client Reference | Mining | Coal | Compliance Dashboard
Our client consists of 4 mid-size coal mines, covering underground, opencast, beneficiation plant as well…
Reference story | Airports | Accurate asset register
Our client gained control of their assets and now know what assets they have, their…
OEM | Tetra Pak | On Key
Pragma, with its expertise and technology in asset and maintenance management, is a key strategic…
Case Study | Local Government | City of Cape Town | Electrical Support Services | Substation Maintenance
The Electrical Support Services (ESS) department is responsible for transformer and switchgear installation and refurbishment,…