Offline and online condition assessments were conducted during the repair process to validate that the workmanship was successfully implemented to the correct standards.
Critical Switchgear Fixes | Water Utility Reference
More content
Case Study | Formex | Manufacturing | Automotive
The results of the air leak survey has triggered an energy management drive within the…
Maintenance Readiness Project | Exxaro Case Study
The new Belfast mine is a high value-add coal project in the Mpumalanga region, with…
Pump Station Maintenance Plans | Metro Case Study
The reticulation network at a local municipality has more than 600 pump stations across the…
Corrosion Maintenance Time Study | City of Cape Town
Pragma’s intervention has led to an increase in the number of units completed per day…
Generator Life Cycle Management | Fuel Retail
Assets or components removed from revamped sites are often still fully functional. We are pleased…
Efficiency & Cost Savings | Pick n Pay Case Study
Pick n Pay is a fast moving consumer goods retailer based in Africa. They operate…
Case Study | Oil and Gas Retail | Shell | Work Manager Application
The Work Manager app has significantly increased data quality, and velocity as data is entered…
Client Reference | Mining | Coal | Life Cycle Costing Model
The LCC model enhances my ability to manage a lean and agile engineering team. This…
Pump Belt Drive Maintenance | Coal Mining Reference
Focused interventions do not necessarily always have to lead to complex solutions where redesign or…
CNV 202 Track Wheel Failure | Coal Mining Case Study
Coal mining operations mine and deliver coal from open cast pit to a crushing circuit.…