Cost savings from elimination of root causes of incorrect cascade positioning failure are calculated to be approximately 1.5 million pula per annum.
Diamonds | Cascade conveyors
More content
Reference story | Airports | Accurate asset register
Our client gained control of their assets and now know what assets they have, their…
Case Study | Manufacturing | Packaging | Equipment Register Review and Criticality Analysis
Nampak is Africa’s largest diversified packaging manufacturer and has been listed on the JSE Limited…
Client Reference | Manufacturing | Automotive | Reducing High Failure Rate of CE Equipment
By doing proper analysis of all EC Tools per station it could be determined which…
Client Reference | Power Utility | Improved MV Substation Reliability and Safety with CM
Time to enhance our substation maintenance programme, by identifying and using CM technologies that allow…
Case Study | Mining | Coal | CNV 202 Take up Track Wheel Failure
Coal mining operations mine and deliver coal from open cast pit to a crushing circuit.…
Reference story | Retail | Costing Model
One costing model, applied across our 200+ contractors enables us to thoroughly manage/verify invoices.
Case Study | Distribution Facilities | Retail | Pepkor
50% decrease in turn around time to complete work orders Accurate and up to date…
Client Reference | Distributed Facilities | Retail | Contract and Contractor Management | On Key
Improving contractor control and rates could result in a potential saving of more than 10%…
Client Reference | Mining and Minerals | Platinum | Reliability Block Diagrams
The client has the opportunity to test various scenarios concerning maintenance interventions, allowing them to…
Reference story | Supermarket / Retail Sector Contractor Management
Our client is one of the largest supermarket retailers in Africa, operating from more than…
