Cost savings from elimination of root causes of incorrect cascade positioning failure are calculated to be approximately 1.5 million pula per annum.
Diamonds | Cascade conveyors
More content
Case Study | Oil and Gas | Asset Health Management LPOC Mitigation
Shell takes strong measures to prevent potential environmental damage. One way to mitigate this risk…
Client Reference | Manufacturing Automative | FI on Light Curtains
Analysing data on production stoppages with the assistance of a highly motivated cross functional team,…
Reference story | Fast Foods | Increase in statutory SLA of tactical WO’s
Since the implementation of the initiative, the statutory SLA for work orders completed increased from…
CNV 202 Track Wheel Failure | Coal Mining Case Study
Coal mining operations mine and deliver coal from open cast pit to a crushing circuit.…
Contractor Management with On Key | Retail Reference
Improving contractor control and rates could result in a potential saving of more than 10%…
Operations Readiness Project | Exxaro Case Study
The new Belfast mine is a high value-add coal project in the Mpumalanga region, with…
Client Reference | Manufacturing | Glass | Improvement of Asset Care Plan
Our client is a leading manufacturer and supplier of float glass, laminated glass and mirrors…
Case Study | Formex | Manufacturing | Automotive
The results of the air leak survey has triggered an energy management drive within the…
Municipality | Sub-station maintenance
The ACC provided a platform for the staff at ESS to be able to easily…
Asset Care Service | Western Cape Health Case Study
The Department of Health Western Cape had, as part of their Hospital Revitalisation Program, identified…