Cost savings from elimination of root causes of incorrect cascade positioning failure are calculated to be approximately 1.5 million pula per annum.
Diamonds | Cascade conveyors
More content
Case Study | Oil and Gas Retail | Shell | HSSE Logger
We now remember to look out for potential incidents on site as we can log…
Case Study | Mining and Minerals | Coal | Exxaro | Maintenance Readiness Project
The new Belfast mine is a high value-add coal project in the Mpumalanga region, with…
Reference story | Retail | Costing Model
One costing model, applied across our 200+ contractors enables us to thoroughly manage/verify invoices.
Case Study | Mining and Minerals | Coal | Exxaro | Operations Readiness Project
The new Belfast mine is a high value-add coal project in the Mpumalanga region, with…
Case Study | Mining and Minerals | Exxaro | Operations Readiness Project
Operations readiness is the process of preparing the custodians of an asset under construction, and…
Case Study | Local Government | Municipality | Nelson Mandela Bay | AIV | AMIP | ACC
The Distribution Directorate is responsible for the maintenance of and extensions to the distribution network,…
Client Reference | Manufacturing | Automotive | Asset Care Development Strategy Implementation
The asset care development plan was successfully implemented and achieved a maturity level of >71%…
Client Reference | Mining Coal | FI on Pump Belt Drive Maintenance and Basic Conditions
Focused interventions do not necessarily always have to lead to complex solutions where redesign or…
Reference story | Automotive | Downtime reduction
The Focused Improvement project at the Marriage Station resulted in a deeper analysis of the…
Municipality | Fleet Management on SAP® PM
Improved Water and Sanitation Fleet Services management results in improved vehicle availability and reliability.