Cost savings from elimination of root causes of incorrect cascade positioning failure are calculated to be approximately 1.5 million pula per annum.
Diamonds | Cascade conveyors
More content
Case Study | Dissolved Gas Analysis Findings of Nampak Glass Transformers
To improve the process of removing the moisture in the transformer oil, a filtration method…
Case Study | Mining and Minerals | Exxaro | Operations Readiness Project
Operations readiness is the process of preparing the custodians of an asset under construction, and…
Coal | Mobile work management
Since the roll-out of the application, it has made it much easier to measure work…
Reference story | Airports | Accurate asset register
Our client gained control of their assets and now know what assets they have, their…
Client Reference | Mining and Minerals Nickel | Reliability Engineering and Training FI
A multi-faceted approach involving facilitated, on-site training courses plus an on-site reliability engineering service, supplemented…
Client Reference | Distributed Facilities | Value Add in Gauteng Retail Outlets
The client is one of the largest retailers on the African continent. They have an…
Reference story | Water utility | SAP® PM optimisation
Moving from an unused SAP® PM system to a well-engineered asset management aligned system.
Client Reference | Manufacturing | Automotive | On Key Work Planning and Control on SAP PM
On Key allows us to plan, schedule and allocate tasks to our artisans based on…
Case Study | Oil and Gas | Asset Health Management LPOC Mitigation
Shell takes strong measures to prevent potential environmental damage. One way to mitigate this risk…
Municipality | Fleet Management on SAP® PM
Improved Water and Sanitation Fleet Services management results in improved vehicle availability and reliability.
