Due to the implementation of the level sensor we can see that the OEE started to increase on plant 2 and contribute to our on time in dispatch as well.
Food and beverage | Downtime reduction
More content
Case Study | Metropolitan Municipality | Pump Station Maintenance Plans
The reticulation network at a local municipality has more than 600 pump stations across the…
Reference story | Automotive | Downtime reduction
The Focused Improvement project at the Marriage Station resulted in a deeper analysis of the…
Case Study | Facilities Rental Apartments | Taking control of maintenance with On Key EAM system and Contractor Management
For Ithemba, as a property management company, the main challenge is the return on investment…
Client Reference | Mining | Coal | Life Cycle Costing Model
The LCC model enhances my ability to manage a lean and agile engineering team. This…
Client Reference | Mining | Coal | Equipment, Material and Spares Codification Project | SAP
Our client is a respected open cast coal mining and processing plant situated in Mpumalanga.…
Case Study | Manufacturing Food and Beverage | Parmalat | CM Leak Detection
Energy costs are monitored by Parmalat management on a monthly basis. The ratios of compressed…
Reference story | Retail | Costing Model
The costing model will result in a 28.5% reduction in travel cost and an overall…
Client Reference | Facilities Retail | Maintenance Budget Management
Our client managed their operational budgets reactively using spreadsheets. It created a lot of manual…
Client Reference | Manufacturing Bottling | Global Beverage Producer: Using Lifecycle Costing for Financial Decision-making
Our client is a global producer of beverages. They package various products on various lines…
Case Study | Productie Voedingsindustrie | C&D Foods | On-Key-implementatie
Pragma ondersteunt het onderhoudsprogramma On-Key van C&D en stelt het management in staat beter inzicht…