The ACC provided a platform for the staff at ESS to be able to easily detect priority work, work that was falling behind and the status of any job at any time.
Municipality | Sub-station maintenance
More content
Case Study | OEM-verpakkingen | Sidel | Volwassenheidsscan asset management met verbeteringen
De consultants van Pragma hebben de volwassenheid van onze organisatie op gestructureerde wijze beoordeeld. De…
Client Reference | Local Government | District Municipality | Water | AMIP
Our client is a typical district municipality (DM) in a rural area of South Africa.…
Client Reference | Mining | Coal | Equipment, Material and Spares Codification Project | SAP
Our client is a respected open cast coal mining and processing plant situated in Mpumalanga.…
Case Study | Oil and Gas | Volt Current Electrical | Retail Supplier Development
Volt Electrical (Volt) was founded in 2016 as a start-up business and a small to…
Case Study | Direct impact of the leak detection survey and repairs estimated at a R 661,672.00 saving per annum
The Parmalat plant in Kyalami produces and packages a number of different yoghurt products. The…
Client Reference | Manufacturing | Automotive | On Key Work Planning & Control on SAP® PM
On Key allows us to plan, schedule and allocate tasks to our artisans based on…
Client Reference | CRS Local Government Hydro Power Station – Spare Parts Optimisation
Discover how structured, value-based spare parts optimization achieved 34%+ IRR. It improved asset uptime, reduced…
Municipality | Fleet Management on SAP® PM
Improved Water and Sanitation Fleet Services management results in improved vehicle availability and reliability.
Client Reference | Mining Coal | FI on LDV Maintenance Costs
This focused intervention will help me to have more control over my costs and to…
Client Reference | Oil and Gas Petrochemical Plant | Equipment Maintenance Strategies
Pragma facilitated the successful development of equipment maintenance strategies and tactics, helped convert them into…
