The Focused Improvement project at the Marriage Station resulted in a deeper analysis of the assembly process, equipment and risks associated with it.
Reference story | Automotive | Downtime reduction
More content
Case Study | Manufacturing | FoodBev | Libstar | Asset Care Academy
The intent was to create a common understanding of maintenance management among all plant engineers…
Mining | Mobile work management
Since the roll-out of the application, it has made it much easier to measure work…
Maintenance Readiness Project | Exxaro Case Study
The new Belfast mine is a high value-add coal project in the Mpumalanga region, with…
Client Reference | Manufacturing Automotive | Improved Operator Asset Care in Body Shop
By empowering our cell technicians to perform routine non tactical maintenance tasks we have not…
Client Reference | Mining | Coal | Life Cycle Costing Model
The LCC model enhances my ability to manage a lean and agile engineering team. This…
Reference story | Water utility | SAP® PM optimisation
Moving from an unused SAP® PM system to a well-engineered asset management aligned system.
Case Study | Oil and Gas Retail | Shell | HSSE Logger
We now remember to look out for potential incidents on site as we can log…
Integrated CMMS | Breede Valley Municipality Case Study
BreedeValley Municipality is a local municipality located within the Cape Winelands District Municipality. The Electro-Technical…
Focused Improvement | Automotive Client Reference
The process we followed was excellent. It helped us identify problems and potential root causes…
Case Study | Direct impact of the leak detection survey and repairs estimated at a R 661,672.00 saving per annum
The Parmalat plant in Kyalami produces and packages a number of different yoghurt products. The…
