Since the implementation of the initiative, the statutory SLA for work orders completed increased from an average of 66% per month to an average of 94% per month.
Reference story | Fast Foods | Increase in statutory SLA of tactical WO’s
More content
Reference story | Water utility | SAP® PM optimisation
Moving from an unused SAP® PM system to a well-engineered asset management aligned system.
Case Study | Mining | Coal | LG Cyclone Feed Pipe
Coal mining operations mine and deliver coal from open cast pit to a crushing circuit.…
Client Reference | Manufacturing | Real-time Condition Based Monitoring with IIoT
The real-time condition monitoring project brought health measures of critical assets within the client’s plant…
Reference story | Automotive | Downtime reduction
The Focused Improvement project at the Marriage Station resulted in a deeper analysis of the…
Client Reference | OEM | Baking Equipment | After Sales Service | Debtor Management | On Key Syspro Interface
Part of our client’s after-sales offering to the market is to have qualified technicians not…
Case Study | On-line condition Assessment Findings of MV Power System (DRUPPS)
Replacement of the feeder cables and terminations under the Pragma quality assurance processes will ensure…
Case Study | Manufacturing | Packaging | Equipment Register Review and Criticality Analysis
Nampak is Africa’s largest diversified packaging manufacturer and has been listed on the JSE Limited…
Case Study | OEM Packaging | Sidel | Asset Management Improvement Assessment
Pragma’s consultants assessed the maturity of our organisation in a structured manner. The output was…
Mining | Planning and Scheduling
Introducing the On Key planning and scheduling tool highlighted the amount of unnecessary Work Orders,…
Case Study | Manufacturing | Electrical Condition Assessment for Nampak Glass Insurance Requirements
Nampak Glass is a leading glass manufacturer producing glass bottles for the food and beverage…
