Shift towards optimal mix of reactive to proactive planned maintenance.
Reference story | Municipal | AM Maturity Assessment
More content
Case Study | Manufacturing Glass | Nampak Glass | FI on IS Machine Maintenance Strategy
This project forms an integral part of the bigger asset management process by highlighting specific…
Case Study | Dissolved Gas Analysis Findings of Nampak Glass Transformers
To improve the process of removing the moisture in the transformer oil, a filtration method…
Mining | Mobile work management
Since the roll-out of the application, it has made it much easier to measure work…
Client Reference | Oil and Gas | Commercial Depots Failure Mode and Effects Analysis
By defining and documenting failure modes across 32 asset types, the client achieved a structured…
Case Study | OEM Packaging | Sidel | Asset Management Improvement Assessment
Pragma’s consultants assessed the maturity of our organisation in a structured manner. The output was…
Client Reference | Water Utility | Fixes on Critical Switchgear Components
Offline and online condition assessments were conducted during the repair process to validate that the…
Case Study | Local Government | Breede Valley Municipality | Integrated CMMS and Systems
BreedeValley Municipality is a local municipality located within the Cape Winelands District Municipality. The Electro-Technical…
Case Study | Mining | Coal | LG Cyclone Feed Pipe
Coal mining operations mine and deliver coal from open cast pit to a crushing circuit.…
Automotive | Improved uptime
With the aid of On Key and the Focused Improvement business process, it assisted us…
Client Reference | Distributed Facilities | Retail | SLA driven performance
Our client is a large supermarket retailer in Africa, operating over 2,500 outlets under 15…
