Reference story | Packaging | Maintenance plans
The biggest benefit of this focused improvement project is the reduction in claims placed by clients due to incorrect spare parts being ordered and work executed.
More case studies
Case Study | Electrical Condition Assessment for Nampak Glass Insurance Requirements
Nampak Glass is a leading glass manufacturer producing glass bottles for the food and beverage…
Find out more
Client Reference | Mining | Coal | Customisation of Asset Tactics Navigation
Our client has a coal open cast mine, with one DMS plant for the beneficiation…
Find out more
Client Reference | Power Utility | Improved MV Substation Reliability and Safety with CM
Time to enhance our substation maintenance programme, by identifying and using CM technologies that allow…
Find out more
Case Study | Direct impact of the leak detection survey and repairs estimated at a R 661,672.00 saving per annum
The Parmalat plant in Kyalami produces and packages a number of different yoghurt products. The…
Find out more
Coal | Mobile work management
Since the roll-out of the application, it has made it much easier to measure work…
Find out more
Case Study | Distributed Facilities | Office Management | Curo Fund Services | Contractor Management and Work Processes
This is how we reduced our client’s printing paper usage by 25% and reduced their…
Find out more
Client Reference | Distributed Facilities | Retail | Contract and Contractor Management | On Key
Improving contractor control and rates could result in a potential saving of more than 10%…
Find out more
Client Reference | Local Government | Fleet Management | Insurance Management Tool
Our client required an insurance management tool to manage and report on insurance claims and…
Find out more
Client Reference | Engineering Services | Client Support Dashboard and Notification
Our client develops, maintains and monitors integrations between various source systems on behalf of their…
Find out more
Case Study | On-line condition Assessment Findings of MV Power System (DRUPPS)
Replacement of the feeder cables and terminations under the Pragma quality assurance processes will ensure…
Find out more