Our client supplies up to 880 000 m3of water to customers daily. This is a large department and has a staff complement of 4 000, an operating budget of R6.6billion and a capital budget of R1.5billion. The current Asset Care Plans (ACPs) were developed with the inception of the ERP system and were not kept up to date with newly installed equipment.
Reference Story | Local Government | Municipality CoCT Waste Water
More content
Case Study | Distributed Facilities | Office Management | Curo Fund Services | Contractor Management and Work Processes
This is how we reduced our client’s printing paper usage by 25% and reduced their…
Case Study | Local Government | Department of Health Western Cape | Asset Care Service
The Department of Health Western Cape had, as part of their Hospital Revitalisation Program, identified…
Client Reference | Local Government | Municipality | Fleet Management Service
Our client is a metropolitan municipality in Southern Africa with a Fleet Management and Maintenance…
Case Study | Facilities | Life Healthcare | On Key
On Key has been implemented at more than 50 Life Healthcare hospitals across South Africa…
Case Study | Oil and Gas | Fuels Retail | Permit To Work Blended Training
The fuels retail sector has a standard health and safety work process for all employees…
Client Reference | Mining Coal | FI on Pump Belt Drive Maintenance and Basic Conditions
Focused interventions do not necessarily always have to lead to complex solutions where redesign or…
Diamonds | Cascade conveyors
Cost savings from elimination of root causes of incorrect cascade positioning failure are calculated to…
Case Study | Manufacturing | Packaging | Work Planning and Control Implementation and Support
Pragma developed a detailed standards manual, including among others: standards for JDE Plant Maintenance configuration…
Case Study | Manufacturing Food and Beverage | Parmalat | CM Leak Detection
Energy costs are monitored by Parmalat management on a monthly basis. The ratios of compressed…
Client Reference | Water Utility | Fixes on Critical Switchgear Components
Offline and online condition assessments were conducted during the repair process to validate that the…