Our client supplies up to 880 000 m3of water to customers daily. This is a large department and has a staff complement of 4 000, an operating budget of R6.6billion and a capital budget of R1.5billion. The current Asset Care Plans (ACPs) were developed with the inception of the ERP system and were not kept up to date with newly installed equipment.
Reference Story | Local Government | Municipality CoCT Waste Water
More content
Reference story | Fast foods | Increase statutory SLA’s
Since the implementation of the initiative, the statutory SLA for work orders completed increased from…
Chicken processing equipment | After sales
For Meyn, it is important to have a trustworthy single view on our Installed Base…
Case Study | Electrical Condition Assessment for Nampak Glass Insurance Requirements
Nampak Glass is a leading glass manufacturer producing glass bottles for the food and beverage…
Client Reference | Manufacturing Automotive | Rotable Spares
The new rotable process is well integrated within all shops at our client. An increase…
Case Study | Oil and Gas | Volt Current Electrical | Retail Supplier Development
Volt Electrical (Volt) was founded in 2016 as a start-up business and a small to…
Client Reference | Mining | Coal | Conversion of TMM Maintenance Plans
Our client is a respected open cast coal mining and processing plant situated in the…
Case Study | Manufacturing | Packaging | Equipment Register Review and Criticality Analysis
Nampak is Africa’s largest diversified packaging manufacturer and has been listed on the JSE Limited…
Reference story | Packaging | Maintenance plans
The biggest benefit of this focused improvement project is the reduction in claims placed by…
Case Study | Oil and Gas Retail | Shell | HSSE Logger
We now remember to look out for potential incidents on site as we can log…
Case Study | Local Government | Metropolitan Municipality | Work Planning and Control on SAP Mobile App
Work Planning and Control managed by the Asset Care Centre (ACC) at a local municipality…