The costing model will result in a 28.5% reduction in travel cost and an overall saving of 5.4% on our maintenance bill.
Reference story | Retail | Costing Model
More content
Liquid packaging | AM maturity assessment
The Pragma consultants were able to assess the maturity of our organisation in a structured…
Municipality | Fleet Management on SAP® PM
Improved Water and Sanitation Fleet Services management results in improved vehicle availability and reliability.
Case Study | Oil and Gas | Retail Sites | FI Generator | Life Cycle Management
Assets or components removed from revamped sites are often still fully functional. We are pleased…
Client Reference | Distributed Facilities | Retail | SLA driven performance
Our client is a large supermarket retailer in Africa, operating over 2,500 outlets under 15…
Client Reference | Mining Coal | FI on Pump Belt Drive Maintenance and Basic Conditions
Focused interventions do not necessarily always have to lead to complex solutions where redesign or…
Case Study | Mining and Minerals | Petra Diamonds | Centralising Asset Tree using a Placeholder Import in On Key
Petra Diamonds is a leading independent diamond producer with one of the worlds largest diamonds…
Reference story | Packaging | Maintenance plans
The biggest benefit of this focused improvement project is the reduction in claims placed by…
Case Study | Mining and Minerals | Coal | Exxaro | Operations Readiness Project
The new Belfast mine is a high value-add coal project in the Mpumalanga region, with…
Diamonds | Cascade conveyors
Cost savings from elimination of root causes of incorrect cascade positioning failure are calculated to…
Reference story | Health Care | Downtime reduction
Inspection preventive maintenance compliance as per legal and safety standards.
