One costing model, applied across our 200+ contractors enables us to thoroughly manage/verify invoices.
Reference story | Retail | Costing Model
More content
Client Reference | Manufacturing Automotive | Rotable Spares
The new rotable process is well integrated within all shops at our client. An increase…
Reference story | Airports | Accurate asset register
Our client gained control of their assets and now know what assets they have, their…
Follow-Up Work Orders in On Key | Shell Case Study
Convenient to electronically capture which assets need repairs while on site and peace of mind…
Substation Maintenance | City of Cape Town Case Study
The Electrical Support Services (ESS) department is responsible for transformer and switchgear installation and refurbishment,…
Critical Switchgear Fixes | Water Utility Reference
Offline and online condition assessments were conducted during the repair process to validate that the…
On Key Syspro Interface | Baking OEM Client Reference
Part of our client’s after-sales offering to the market is to have qualified technicians not…
Client Reference | Mining | Coal | Life Cycle Costing Model
The LCC model enhances my ability to manage a lean and agile engineering team. This…
Pump Station Maintenance Plans | Metro Case Study
The reticulation network at a local municipality has more than 600 pump stations across the…
Case Study | Improving Proactive Maintenance in Local Government
The number of processed proactive work orders increased by 103% YTD benchmarked to the previous…
Reference story | Municipal | AM Maturity Assessment
Shift towards optimal mix of reactive to proactive planned maintenance.
